Loading...
P.O. Box 159 – 8356 Bay Street Sodus Point, NY 14555 Phone: 315-483-9881

South Ontario Street Canoe & Kayak Launch


South Ontario Street Canoe & Kayak Launch

In 2018 the Village of Sodus Point received a grant from New York Sea Grant to fund a handicap launch system at the end of South Ontario Street.

The site was chosen after reviewing five different options. The South Ontario street location was identified in the three different plans for the Village and detailed in the Great Sodus Bay Waterfront Initiative. In 2012 the Village Planning board developed a plan for access areas along Sodus Bay and also identified South Ontario Street.

South Ontario Street is currently the conveyance point for roughly 1/3 of the Village’s stormwater drainage, an estimated 52 acres. The area represents the first phase of a drainage project sponsored by the Wayne County Soil and Water Conservation District. This phase is anticipated to be completed in July 2019.

At present the location has a problem with unsightly iron bacteria caused by legacy upstream infrastructure and is also infested with invasive species. These problems are being addressed with a planned rain garden at the end of the street within the boundaries of the proposed launch location. The Village recognizes that local infrastructure sustainability is critical to long term economic development. GI and stormwater management can help meet a wide range of community needs. With its network of natural environment components and green and blue spaces; GI provides multiple social, economic and environmental benefits as well as set the stage for eco-tourism and most importantly improvement of the water quality of Sodus Bay. Stormwater educational activities will accompany the project. When completed the location will have environmental education interpretive signage and an invasive species disposal box.

There will be an annual clean-up day.

Amenities:

Shoreline bench – looking for donations
Invasive Species disposal box (secured through boy scouts)
Stormwater rain garden (future)
Educational rain garden signage (secured through SOS)

Timeline:

Mid to Late August 2019, the delay is due to drainage work in the area.

 

Features:

Removable dock; Memorable Day to Labor Day
Easy pull up for Handicap
Turn around and two handicap parking spaces.
Additional parking has been secured at the Methodist Church Parking lot. Signage will be placed at site.

Future:

Future consideration will be given to other identified areas as shoreline improvements are completed.

Willow Park
Featherly Drive
South Shore Drive

(residential access at Wickham)

The hope is to develop a blue water trail that connects around Sodus Bay.

VILLAGE MEETINGS
The Village of Sodus Point meeting starts at 6:30 P.M. Join Zoom Meeting https://zoom.us/j/419552749 Meeting ID: 419 552 749 One tap mobile +16465588656,,419552749# US (New York)
Current Weather Radar

Contact Us

Phone: 315-483-9881

Fax: 315-483-0918

Village Clerk tdurham@soduspoint.info


Code Enforcement:

315-310-0534

ceo@soduspoint.info


Mayor Dave McDowell

585-739-1398(cell)

dmcdowell@soduspoint.info

Brush Schedule
Monday, April 6th We WILL pick up brush next Monday, April 6th. After this pick up brush collection will be SUSPENDED until further notice. The brush dump site, behind the old water plant on Featherly Drive, is open and you can take your brush there. Please do not put it roadside beyond April 6th.

 

REDI Projects
REDI Workshop 10:00 A.M. - Noon Village Hall January 18th, 2020 Come see & comment on the REDI projects. 8356 Bay Street, Sodus Point, NY