Sodus Point Main Street Market Analysis
Market conditions and opportunities in downtown Sodus Point
Download PDF
South Ontario Street Drainage Project
Highlighting the impressive strides taken by the Village to partner and complete this project as part of the NYSDEC's Water Quality Improvement Program Round 13
Link to Project Page
Greig St. inclusive of Wickham Blvd
This would replace any existing stormwater system and replace it with a comprehensive solution from Bay Street Extension East in the village. It would include 2 new outfalls, eliminate a current outfall and provide valves at each location. It is anticipated that we could install a permanent pump to handle this entire area in the event of high water. The conceptual design that was completed is being revised based on community feedback.
Visit Project Page
Beach Dunes Protection
To eliminate the need for water barriers and sandbags, there is a need to establish/re-establish a sand berm and plant it with seagrass from First Street through Eight Street. Rebuilding the shoreline to a height of 3-4 feet should be sufficient. Street end boardwalk entrances should be used in both establishing the berms and ensuring stability. Sand transport will need to be continually monitored in the most westerly areas as those beach locations tend to have losses. This area is approximately 1,900ft.
Visit Project Page
Lakestones Drive
This project seeks to address erosion and protect wastewater infrastructure west of and along Lakestones Dr. in the Village of Sodus Point. Currently, two homes with wastewater mains across the properties are at risk of being damaged if erosion is not controlled. There is also a sewer manhole several feet from the lakeshore. The proposed mitigation measures in the project will consist of: Repairing and improving approximately 700 ft of existing shoreline and stabilization of previously installed infrastructure.
The 700 feet is also prone to losing property along the lake.
Visit Project Page
White Birch Campground
This project seeks to address erosion encroaching on an eight-inch sewer line at the White Birch Campground in the Village of Sodus Point. The campground has direct exposure to the lake and continued erosion would expose the eight-inch sewer line. The proposed mitigation measures in the project will consist of installing approximately 1,000 ft of shoreline stabilization and will protect the wastewater infrastructure and campground that serves approximately 200 temporary and semi-permanent camp locations. Additionally, these stabilization measures will protect the shoreline from continued erosion. In total there are approximately 5,150 feet that need to be protected.