SERVICE TYPE | FEES | CofO/CofC FEE |
|
ADMINISTRATIVE | |||
CofO / CofC Certificate of Occupancy or Certificate of Compliance non commercial | $25 | N/A | N/A |
CofO / CofC Certificate of Occupancy or Certificate of Compliance Commercial | $100 | N/A | N/A |
Truss placard fee for new construction, existing residence having an addition, repair, renovation, and or reconstruction done that has engineered wood products (Truss, Laminated Beams and/or I Joists) | $15 | N/A | N/A |
SUBDIVISION | $40 | N/A | |
ZBA – VARIANCE APPLICATION | $50 | N/A | |
PLANNING BOARD – SITE PLAN REVIEW | $50 | N/A | |
SPECIAL PERMIT | $40 | N/A | |
PERMIT RENEWAL One Time renewal of a prior issue building permit: | 100% of permit fee, or a minimum charge of $50 dollars plus postage. | N/A | N/A |
DEMOLITION of a building: | $75 each permit | N/A | N/A |
CONSTRUCTION WITHOUT PERMIT. In the event construction is commenced and/or completed prior to a building permit being issued. | A building permit shall be issued only after payment of all applicable fee or fees, plus an administrative fee of $100 |
With the understanding that a certificate of occupancy (CofC) or certificate of compliance (CofO) will not be issued unless all inspections have been made as required by the building code of New York State. |
|
NEW CONSTRUCTION | |||
Residential fence, living Fence | $25, plus Planning Board Approval | CofC required | $25.00 |
Commercial fence, living fence | $50, plus Planning Board Approval | CofC required | $100.00 |
Sheds, out buildings, and accessory buildings: Commercial Sheds |
$50 per structure or $1 per 100 square feet whichever is greater $250 or .10 per square foot whichever is greater plus $100. |
CofC required | $25.00 |
Installation of pole barn, garage and or replacement on a residential lot and or other accessory building not specifically listed in this fee schedule: | $100 permit fee or .10 per square foot greater than 1,000 square feet, whichever is greater | CofC required | $25.00 |
Dwellings on one-lot developments: | $250 per unit, plus an additional $0.20 per square foot over 1,500 square feet | CofO required | $25.00 |
Commercial and/or industrial buildings and/or other nonresidential buildings | $250 minimum permit fee or .10 per square foot whichever is greater | CofO or CofC | $100.00 |
Multiple Family Dwellings | $400, plus $50 per unit more than 3 units, plus an additional $.20 per square foot over 1,500 square ft. per unit | CofO required Per Unit |
$25.00 |
RENOVATIONS /RECONSTRUCTIONS | |||
Residential building, any additions: | $100 minimum permit fee or .20 per square foot whichever is greater | CofO or CofC | $25.00 |
Commercial and/or industrial buildings and/or other nonresidential building additions, renovations, alterations, reconstruction, change of use | $250 minimum permit fee or .10 per square foot whichever is greater | CofO or CofC | $100.00 |
Renovation of home, finishing basement, attic/and or other unfinished spaces, adding emergency egress window | $75 permit fee | CofO or CofC | $25.00 |
Attic/ Basement and/or other unfinished spaces, adding emergency egress window to a home | $75 permit fee | CofO or CofC | $25.00 |
Decks,breezeways, enclosed or open porch, sun-room, carports: Installation and/or replacement of | $50 each plus $50 for each re-inspection | CofO required | $25.00 |
Fireplace installation, wood stove installation and/or replacement including chimney inspection, property maintenance inspection as requested: | $50 each plus $50 for each re-inspection | CofO required | $25.00 |
Roof tear off or re-roof | $50 permit fee | CofC required | $25.00 |
ELECTRICAL WORK BY ANY CONTRACTOR | $40 | CofC required | $25 |
FIRE SAFETY INSPECTIONS | $50 fee plus an additional $25 for every inspection after the first | N/A | N/A |
OTHER | |||
Fireplace installation, wood stove installation and/or replacement including chimney inspection, property maintenance inspection as requested: | $50 each plus $50 for each re-inspection | CofO required | $25.00 |
Furnaces, central air conditioning unites and/or water heaters, replacement of: | $40 permit fee | CofC required | $25.00 |
Generators Residential: Installation and/or repair of standby residential generator: | $50 permit fee | CofC required | $25.00 |
Generators Commercial: Installation and/or repair of standby commercial generator: | $150 permit fee | CofC required | $25.00 |
Manufactured Home / placement of | $150 permit fee | CofO required | $25.00 |
Recreational Vehicle / placement of | $100 first time permit fee and $25 each time there after | CofC required | $25.00 |
Septic System inspection on an existing lot for replacement and/or new: | $75 each, plus $50 for each additional inspection in excess of two inspections | CofO required | $25.00 |
Solar panels , residential tower antenna, windmill, or any green power application | $75 permit fee, plus $75 for each additional inspection | CofO required | $25.00 |
Swimming Pools: Installation and replacement of swimming pools and/or hot tubs in residential zoning districts | $60 each, plus $30 for each additional inspection | CofO required | $25.00 |
SIGNAGE | |||
Residential permanent signage | $50 | CofC required | $25.00 |
Commercial permanent signage | $50 | CofC required | $100.00 |
Temporary signage | $25 | Agreement of removal of signage | N/A |
DOCKS AND DOCK INSPECTIONS | |||
Dock Permit & Inspection for residential use | $75 every 36 months $25 for an inspection as requested | N/A | N/A |
Dock Permit & Inspection for commercial use | $75 or $.10 per linear ft. which ever is greater | N/A | N/A |
Mooring Buoy | N/A | N/A |

- Welcome!
- Community Center & Schedules
- Faith Communities
- Community Organizations
- Neighborhood Association (NASP)
- Community Events - you're invited
- _______________
- ANNUAL EVENTS
- July 3rd Independence Day Extravaganza
- Labor Day Fireworks and Car Parade
- Sodus Bay Heights Golf Club
- Sodus Bay Lighthouse Museum
- Sodus Point Ice Rink
- Sodus Point Beach Park
- Sodus Bay Community Boating Center at SBJSA
- Sill Landing Kayak and Canoe Launch
- Macyville Woods Nature Preserve
- Fish Sodus Bay - Fishing Reports
About Our Village
Community Activities
Attractions
In and Around the Area
- My Government
- Contact Village
- Online Payments Water & Sewer / Taxes
- Forms and Fees
- Flood Emergency Contact Form
- Freedom of Information Law Requests FOIL
- Village Close Dates
- Speed Limit, Dogs, Wildlife and Other Local Laws
- FAQ - Village
- Mayor and Village Trustees
- 2020 Board Meeting Schedule
- Village Board Meetings live
- Meeting Calendar
- Village Meeting Minutes
- Code of Ethics
- Tax Rolls
- NYS Comptroller's Report
- Wayne County Property Tax Search
- Assessor's Office (Town of Sodus)
- ____________
- Tax Rates
- Village Budgets
- Annual Budget Process
- Highway Trees & Parks
- Brush Schedule and Guidelines
- Wastewater Department
- Water Department
- Fire Department - Call 911
- Silver Water Ambulance - Call 911
- Sodus Point Economic Development
- Job Application
- ____________
- Wayne County Sheriff
- Animal Control 315-483-6311
- ____________
- State and Federal Representatives
Clerk- Treasurer
Village Board
Finance
DEPARTMENTS & SERVICES
- CODE ENFORCEMENT
- Code Enforcement Office
- Fee Schedule
- Zoning Districts Village of Sodus Point
- CEO Office 315-310-0534
- Village Code Book
- Zoning Code Section 190
- 190-11 Denisity Control - Setbacks
- 190-8 Permitted Uses In Districts
CEO Contact
Village Code
FREQUENTLY ASKED QUESTIONS
Forms & Required Permits
- Zoning & Planning
- Zoning Districts
- LWRP - Master Plan
- Downtown Vision Plan
- Sodus Bay Waterfront Initiative
- Great Sodus Bay Harbor Management Plan
- Village Planning Board
- Planning Board Minutes
- Waterfront Assessment Form
- Planning 1st and 3rd Mondays
- __________________
- Planning and Zoning Meeting Notices
- What is the Zoning Board of Appeals?
- Zoning Board Minutes
- What is a Variance?
- Understanding Hardships
- Zoning 2nd and 4th Mondays
Comprehensive Plans
Planning Board
Zoning Board of Appeals
Grant Funded Projects
- Public Notices
- What is the IJC Plan 2014?
- Water Levels Daily - USACE
- Great Lakes Water Levels Updates - USACE
- Lake Ontario Water Levels Forecast (Month) USACE
- Residential flood prevention
- IJC - Weekly Regulation Summary
- IJC - Lake Ontario Outflows
Water Levels - links to IJC & USACE
Village Updates
Legal Notices & More
- REDI
Building Construction Fee Schedule
Building Fee Schedule
Code Officer Phone: 315-553-2695 Fax: 315-483-0913
TDD 800-662-1220Frequently Asked Questions
- Alterations, improvements and remodeling of garages; carports; all sheds; roofing; siding; decks; porches; stairs; fences; swimming pools in which the water depth is two feet or greater; heating systems (new and replacement); hot tubs; fire suppression systems; fire alarm systems; solid fuel burning appliances; gas-fired decorative appliances; parking lots.
- Fences require a permit and planning board approval, this includes a hedgerow (living fence.)
- Roof tear down requires a permit
- Demolition of any structure requires a permit
- Sheds or other outdoors structures require a permit and may require Planning and Zoning Board approval
- Garage sales must be concluded within seven days, with the exception of nonprofit organizations, and may be held no more than twice a year.
- Boats which are not seaworthy or which have been abandoned may not be left in public view for more than 12 months
- Names and addresses of adjoining properties are required on your building permit
Photos © Chris Trine, John Frisbie, Timmerman Photography, Cathy Contant, John Kutko Digital
© 2001-2020 Village of Sodus Point
VILLAGE MEETINGSThe Village of Sodus Point meeting starts at 6:30 P.M. Join Zoom Meeting https://zoom.us/j/419552749 Meeting ID: 419 552 749, PWD 434157 One tap mobile +16465588656,,419552749# US (New York)
Current Weather RadarContact UsPhone: 315-483-9881
Fax: 315-483-0918
Village Clerk tdurham@soduspoint.info
Code Enforcement:
315-310-0534
ceo@soduspoint.info
Mayor Dave McDowell
585-739-1398(cell)
dmcdowell@soduspoint.info
Brush ScheduleMonday, August 17th
Monday, August 17th
Monday, September 14th
Monday, October 13th
Monday, October 26th (Last Day of Brush)
Monday, November 16-20th (Leaf Week)Brush and leaf Collection may be required past the final scheduled date as determined by department head, however all collection ends on Friday, November 29. Christmas tree collection upon request.
REDI ProjectsNo scheduled meetings