Loading...
P.O. Box 159 – 8356 Bay Street Sodus Point, NY 14555 Phone: 315-483-9881

Building Construction Fee Schedule


Building Fee Schedule

Code Officer Phone: 315-553-2695 Fax: 315-483-0913
TDD 800-662-1220

Download a fee schedule

SERVICE TYPEFEESCofO/CofC
FEE
ADMINISTRATIVE
CofO / CofC Certificate of Occupancy or Certificate of Compliance non commercial$25N/AN/A
CofO / CofC Certificate of Occupancy or Certificate of Compliance Commercial$100N/AN/A
Truss placard fee for new construction, existing residence having an addition, repair, renovation, and or reconstruction done that has engineered wood products (Truss, Laminated Beams and/or I Joists)$15N/AN/A
SUBDIVISION$40N/A
ZBA – VARIANCE APPLICATION$50N/A
PLANNING BOARD – SITE PLAN REVIEW$50N/A
SPECIAL PERMIT$40N/A
PERMIT RENEWAL One Time renewal of a prior issue building permit:100% of permit fee, or a minimum charge of $50 dollars plus postage.N/AN/A
DEMOLITION of a building:$75 each permitN/AN/A
CONSTRUCTION WITHOUT PERMIT. In the event construction is commenced and/or completed prior to a building permit being issued.A building permit shall be issued only after payment of all applicable fee or fees, plus an administrative fee of $100
With the understanding that a certificate of occupancy (CofC) or certificate of compliance (CofO) will not be issued unless all inspections have been made as required by the building code of New York State.
NEW CONSTRUCTION
Residential fence, living Fence$25, plus Planning Board ApprovalCofC required$25.00
Commercial fence, living fence$50, plus Planning Board ApprovalCofC required$100.00
Sheds, out buildings, and accessory buildings:
Commercial Sheds
$50 per structure or $1 per 100 square feet whichever is greater
$250 or .10 per square foot whichever is greater plus $100.
CofC required$25.00
Installation of pole barn, garage and or replacement on a residential lot and or other accessory building not specifically listed in this fee schedule:$100 permit fee or .10 per square foot greater than 1,000 square feet, whichever is greaterCofC required$25.00
Dwellings on one-lot developments:$250 per unit, plus an additional $0.20 per square foot over 1,500 square feetCofO required$25.00
Commercial and/or industrial buildings and/or other nonresidential buildings$250 minimum permit fee or .10 per square foot whichever is greaterCofO or CofC$100.00
Multiple Family Dwellings$400, plus $50 per unit more than 3 units, plus an additional $.20 per square foot over 1,500 square ft. per unitCofO required
Per Unit
$25.00
RENOVATIONS /RECONSTRUCTIONS
Residential building, any additions:$100 minimum permit fee or .20 per square foot whichever is greaterCofO or CofC$25.00
Commercial and/or industrial buildings and/or other nonresidential building additions, renovations, alterations, reconstruction, change of use$250 minimum permit fee or .10 per square foot whichever is greaterCofO or CofC$100.00
Renovation of home, finishing basement, attic/and or other unfinished spaces, adding emergency egress window$75 permit feeCofO or CofC$25.00
Attic/ Basement and/or other unfinished spaces, adding emergency egress window to a home$75 permit feeCofO or CofC$25.00
Decks,breezeways, enclosed or open porch, sun-room, carports: Installation and/or replacement of$50 each plus $50 for each re-inspectionCofO required$25.00
Fireplace installation, wood stove installation and/or replacement including chimney inspection, property maintenance inspection as requested:$50 each plus $50 for each re-inspectionCofO required$25.00
Roof tear off or re-roof$50 permit feeCofC required$25.00
ELECTRICAL WORK BY ANY CONTRACTOR$40CofC required$25
FIRE SAFETY INSPECTIONS$50 fee plus an additional $25 for every inspection after the firstN/AN/A
OTHER
Fireplace installation, wood stove installation and/or replacement including chimney inspection, property maintenance inspection as requested:$50 each plus $50 for each re-inspectionCofO required$25.00
Furnaces, central air conditioning unites and/or water heaters, replacement of:$40 permit feeCofC required$25.00
Generators Residential: Installation and/or repair of standby residential generator:$50 permit feeCofC required$25.00
Generators Commercial: Installation and/or repair of standby commercial generator:$150 permit feeCofC required$25.00
Manufactured Home / placement of$150 permit feeCofO required$25.00
Recreational Vehicle / placement of$100 first time permit fee and $25 each time there afterCofC required$25.00
Septic System inspection on an existing lot for replacement and/or new:$75 each, plus $50 for each additional inspection in excess of two inspectionsCofO required$25.00
Solar panels , residential tower antenna, windmill, or any green power application$75 permit fee, plus $75 for each additional inspectionCofO required$25.00
Swimming Pools: Installation and replacement of swimming pools and/or hot tubs in residential zoning districts$60 each, plus $30 for each additional inspectionCofO required$25.00
SIGNAGE
Residential permanent signage$50CofC required$25.00
Commercial permanent signage$50CofC required$100.00
Temporary signage$25Agreement of removal of signageN/A
DOCKS AND DOCK INSPECTIONS
Dock Permit & Inspection for residential use$75 every 36 months $25 for an inspection as requestedN/AN/A
Dock Permit & Inspection for commercial use$75 or $.10 per linear ft. which ever is greaterN/AN/A
Mooring BuoyN/AN/A

Frequently Asked Questions

  • Alterations, improvements and remodeling of  garages; carports; all sheds; roofing; siding; decks; porches; stairs; fences; swimming pools in which the water depth is two feet or greater; heating systems (new and replacement); hot tubs; fire suppression systems; fire alarm systems; solid fuel burning appliances; gas-fired decorative appliances; parking lots.
  • Fences require a permit and planning board approval, this includes a hedgerow (living fence.)
  • Roof tear down requires a permit
  • Demolition of any structure requires a permit
  • Sheds or other outdoors structures require a permit and may require Planning and Zoning Board approval
  • Garage sales must be concluded within seven days, with the exception of nonprofit organizations, and may be held no more than twice a year.
  • Boats which are not seaworthy or which have been abandoned may not be left in public view for more than 12 months
  • Names and addresses of adjoining properties are required on your building permit
VILLAGE MEETINGS
6:25 P.M. Code Changes
6:30 P.M. Village Board Meeting July 18th
6:30 P.M. Village Board Meeting August 15th
Current Weather Radar

Contact Us

Phone: 315-483-9881

Fax: 315-483-0918

Village Clerk tdurham@soduspoint.info


Code Enforcement:

315-553-2695

ceo@soduspoint.info


Mayor Dave McDowell

585-739-1398(cell)

dmcdowell@soduspoint.info

Village Projects

06-04-2019 The Village crews are still assisting with sandbagging, brush pick up is to begin the week of June 10th

Brush Schedule

Generally, brush will be collected twice monthly during the months of April, May, September, October and November.

Monday, June 10th
Monday, July 8th
Monday, August 12th
Monday, September 9th
Monday, September 23rd


 
Tuesday, October 15th
Monday, October 29th
Tuesday, November 12th 

Brush and leaf Collection ends on Wednesday, November 27 Christmas tree collection as needed

Water Level Links

USACE Daily Water Levels -:- Ottawa River Forecast  -:- USACE Great Lakes Water Levels -:- IJC Weekly Regulation Summary -:- IJC Lake Ontario Outflows-:- USACE Weekly


Additional water level information can be found under the public notice tab. This area will be used for emergency water level information.